☀   ROOTED IN JAMMU & KASHMIR · ILLUSTRATIVE SOLAR COMPANY DEMO
Panel compliance

DCR vs Non-DCR
solar panels.

Know the difference between domestic-content compliance, panel technology, performance and government subsidy eligibility.

Get a free estimate ↗
Subsidy-relevant category

DCR panels

Domestic Content Requirement means compliance with the scheme's India-manufacturing requirements for both solar cells and modules. The PM Surya Ghar CFA requires these compliant components.

  • Solar cells manufactured in India as required by MNRE rules
  • Modules manufactured in India
  • Verify documentation and compliance with approved lists
  • Relevant to PM Surya Ghar residential subsidy
Not eligible for this CFA

Non-DCR panels

Panels that do not meet the scheme's Indian cell-and-module content requirement. They may be lawful and technically suitable for some other solar projects.

  • May use imported solar cells or modules
  • Can offer various technologies and efficiency options
  • Do not qualify for PM Surya Ghar residential CFA
  • Check project type and applicable procurement rules
DCR is not a panel-efficiency rating. A DCR module can use TOPCon, mono PERC or another supported technology. Compare actual tested efficiency, temperature coefficient, warranty, manufacturer and documentation separately.

Primary sources: MNRE PM Surya Ghar operational rules ↗ · MNRE domestic cell manufacturing clarification (March 2025) ↗.

Quick comparison

What actually changes?

FeatureDCRNon-DCR
Indian cell & module contentRequired under scheme normsNot necessarily
PM Surya Ghar residential CFAPotentially eligible with all other rules metNot eligible
Solar generation performanceDepends on specific moduleDepends on specific module
CostVendor & product dependentVendor & product dependent
Best buying decisionCompliant residential subsidy projectsOther suitable non-subsidized projects
Before you sign

Ask the installer for these documents.

Module make & model

Model number, factory datasheet, rated output, production warranty and performance warranty.

DCR declaration

Documentation proving relevant domestic cell/module compliance for the installed batch.

Inverter & structure details

Brand, protection components, earthing, mounting approach and expected operation.

Written exclusions

Net-meter charges, civil work, insurance, GST, monitoring and maintenance should be explicitly itemized.

A brighter bill starts here

Ready to make your rooftop
work for you?

Share your electricity bill and approximate location. We'll prepare a no-obligation, site-specific solar proposal.

Get my solar proposal ↗